PROJECT LEHRTE
Temporary kitchen Edeka Supermarket
Kitchen for meat preparation
- LEHRTE
- 108M²
- 2 DAYS
- 26 WEEKS
We were asked to install a temporary kitchen for an Edeka supermarket in Lehrte (Germany) during renovation work. This project is realized in collaboration with ARTUS Bautrocknung- und Sanierungsgruppe.
Our 6 ‘NxtGen’ modular kitchen units are equipped with several refrigerated areas and one open area in which the users can place their own specific meat processing equipment. The kitchen is installed for an expected rental period of 26 weeks.
Specifications
- 108 m² modular temporary kitchen
- Customized modern design
- Construction time: 2 days
- Rental period: 26 weeks
- Delivered ‘Turn Key’
- 6 units from the modular NxtGen Kitchens Building System,
- Each unit measures 18 m²
Specials & techniques
- Complete kitchen for meat preparation including multiple cooling and storage rooms
- Optimal layout in a limited space
- The entire kitchen is equipped with an R-12 non-slip resin floor
- Partial use of own kitchen equipment
- Precise placement with a crane
NxtGen kitchens units
- Interchangeable walls, doors, and windows
- Flexible layout of the space including water and electrical connections
- Flexible placement of appliances and extractor hoods
- Optional air conditioning
- Ready for use after only 2 days of assembly
- Complies with current legislation and regulations regarding hygiene and safety