PROJECT LIEBHERR
Temporary kitchen and restaurant
PROJECT
- KIRCHDORF
- 450 M²
- 8 WEEKS
- 36 MONTHS
At Liebherr-Hydraulikbagger GmbH in Kirchdorf (DE), we installed a temporary kitchen, including a restaurant, during the renovation of the existing canteen.
The ‘NxtGen Industrial Building,’ covering an area of 450m², includes a professional kitchen, a cafeteria with serving counters, multiple refrigeration rooms, dry storage, and a dishwashing kitchen. Changing rooms for the staff complete the facility. Even some elements of the interior design incorporate the company’s distinctive (yellow) corporate color!
Specifications
- Total area 450 m², including 150 m² for the kitchen and 300 m² for the restaurant
- Assembly time: 8 weeks
- Rental period: 36 months
- Delivered ‘Turn Key’
- 9 glass panels of 235 x 200 cm for additional daylight and comfort
Special features & technologies
- The kitchen and restaurant feature an R-12 anti-slip (poured) floor
- Includes changing rooms
- Both kitchen and restaurant fully equipped with air conditioning
- During winter operation, heated air supply is available
- Sunshades for the glass panels
NxtGen Industrial Building
- Permit possible as temporary or permanent building
- Flexible space layout
- Appearance of a permanent building
- A reusable, sustainable structure
- Complete circular construction method (Designed for Disassembly)
- Compliant with current legislation and regulations
- High-quality insulation
- Customizable elements for clients